All services

Energy performance

Energy performance, BER and Part L compliance

Domestic and non-domestic BER, Part L and NZEB compliance modelling, and IES thermal modelling — from baseline assessment through to SEAI registration.

Project stage
Concept design through to as-built
Standards
DEAP · NEAP · Part L · NZEB
Deliverable
BER certificate and compliance report
Request a quote

Energy performance is settled by decisions about fabric, form and services that are made long before anyone applies for a certificate. Assessed at the end, a BER reports the result. Modelled at the start, it changes it.

We carry the work through all four stages — baseline assessment on DEAP or NEAP input, energy analysis in IES, optimisation of the fabric and renewable options, then registration and certification with SEAI — with in-house domestic and non-domestic assessors, so the modelling and the certification are not split between two suppliers.

Who this is for

Design teams working to Part L and NZEB

Compliance modelling produced early enough to inform the specification, with provisional certification at design stage and the final survey and evidence coordination handled at completion.

Developers and contractors

One consultancy covering domestic and non-domestic assessment across a scheme, rather than separate assessors for the houses, the apartments and the commercial element.

Projects weighing fabric against renewables

The optimisation stage compares fabric improvements and renewable options against the same model, so the trade-off is decided on numbers rather than on assumption.

How the process works

  1. 01Assess — DEAP or NEAP input and baseline
  2. 02Model — IES and energy analysis
  3. 03Optimise — fabric and renewable options
  4. 04Certify — SEAI registration and BER

Frequently asked questions

What is the difference between a domestic and a non-domestic BER?

Domestic ratings are calculated under DEAP and cover dwellings; non-domestic ratings use NEAP and cover offices, retail, healthcare, schools and other commercial buildings. The two methodologies and the assessor registrations are separate — we hold both in-house.

When should energy modelling start on a project?

At concept design. The fabric, glazing ratio, orientation and services decisions that set the result are cheapest to change before the design is fixed, which is the whole point of modelling at design stage rather than assessing at the end.

What is NZEB?

Nearly Zero Energy Building — the performance standard new buildings in Ireland must meet under Part L. Demonstrating it requires compliance modelling, which we produce alongside the provisional and final BER.

Do you handle SEAI registration as well as the modelling?

Yes. The certification stage covers the final survey, the evidence coordination behind it, and registration of the certificate with SEAI.

What is IES used for?

IES is a dynamic simulation package. It models the building hour by hour across a full year rather than as a single steady-state calculation, which is what makes it usable for energy analysis, overheating and thermal comfort work.